Plan the connection work
Level 2 supply work suited to your Beverley Park property
Level 2 work can cover the service connection between the electricity network and the property installation. The work may involve consumer mains, an overhead or underground service, disconnection and reconnection, service equipment or a supply change. The exact boundary is checked for the property rather than assumed.
Share any defect notice, distributor reference, proposed load change or building schedule. The assessment considers St George service-area needs and the local property context: Beverley Park properties include a range of home layouts; indoor, garage and outdoor electrical work should be planned around the actual cable route and existing protection.