About new property power connections in Sydney
A new property connection requires a suitable installation, connection design, distributor application and metering arrangement. The service route, supply capacity, property readiness and local network requirements can affect timing and cost. Network approval must be obtained before connection work is scheduled.
Assessment, approvals and work sequence
We review the site and proposed supply, identify required customer-side works, support the connection process within our authorised scope, and coordinate service connection and metering steps with the relevant parties.
Before work proceeds, the job is checked against the service connection point, distributor rules, any required application or inspection, and the responsible party for each part of the installation. Quotes depend on site access, materials, outage coordination and approved scope.